Small-Batch Artisan Atelier for Independent Labels · Low MOQ 50 Pcs · Worldwide Shipping

Home / All / Sourcing & Production Guides / Tech Pack or Sketch? What to Send a Dress Manufacturer for an Accurate Quote

Tech Pack or Sketch? What to Send a Dress Manufacturer for an Accurate Quote

Sep 2,2026
Key Takeaways

Send a tech pack, not just a sketch—a tech pack returns a costed quote; a sketch only returns a first pattern.

  • Quote within 24h of a complete BOM.
  • Fabric = composition + GSM (80–220 working range).
  • MOQ 50 pcs/style, free size split—state the grading rule.
  • Sampling ~7 days after confirmation; 30% deposit to start.
  • QC AQL 2.5 batch self-inspection before shipment.

Bottom line: the fuller the tech pack, the tighter the quote and the reorder.

The Quote Isn't Wrong—It's Wrong the Day You Send a Sketch as a Tech Pack

Many small brands' first inquiry looks like this: a hand-drawn sketch plus "make a dress like this, quote me a price." The quote isn't "wrong," but it isn't for the dress in your head—it's for the dress the factory completed using its default construction and default fabric. By the time the sample returns, what's off isn't just the price; it's the whole silhouette direction.

The difference is simple: a tech pack buys you a spec with cost attached; a sketch only buys you a first paper pattern. The former makes the quote match the dress you want; the latter merely gets the factory started.

A Tech Pack Locks the Construction; a Sketch Only Buys You a First Paper Pattern

The core job of a tech pack is to nail the construction before a China dress manufacturer quotes—neckline, sleeve, seam type, topstitch width, lining, closures, finishing. Once nailed, the number the factory quotes corresponds to that specific dress, not a "close enough" one.

A sketch can absolutely start production, but it defaults to the factory's "general practice": it uses the most handy fabric in stock to make the first sample. The sample may look great, but it can't be quoted—because the construction and fabric were chosen by the factory, not by you.

DimensionTech packSketch
What you sendConstruction, fabric, sizes, trims written outOne drawing, maybe a photo
First sampleMatches the dress you specifiedFactory's default construction
Quoted priceTied to your spec, broken down line by lineA "close enough" guess that grows later
Rework riskLow—the spec is locked before sewingHigh—details get decided for you
Best forAccurate quote, reorders that matchKicking off an idea fast
Custom floral linen dress finished product

This is what the finished product looks like—but before quoting, write "why it looks like this" into the tech pack.

How a Dress Manufacturer Returns Your First Sample in About 7 Days

Let's be clear on the timeline to avoid mismatched expectations: the first sample and the pre-production (PP) sample are two different stages with very different lead times. Many disputes come from reading "about 7 days" as "the PP sample also in about 7 days."

StageLead timePreconditionCommon misunderstanding
First sampleUsually about 7 daysComplete tech pack, or sketch + the 3 items belowRead as "all samples in about 7 days"
PP sample2–3 weeksAfter fabric/trims, grading, spec sheet confirmedAssume it's still that fast after spec is locked

A factory can turn a first sample in about 7 days only if your materials are usable: either a complete tech pack, or a sketch plus the 3 items we list below. The more complete the materials, the fewer reworks, the shorter the lead time.

A Quotable Dress Tech Pack Needs at Least These 9 Items

You don't need professional software; a clearly structured table works. The core 9 items in the tech pack template we give partner clients—each one maps to a variable in your quote:

1

Style drawing

Front and back line art (even a scanned hand drawing), marking neckline, sleeve, waist, hem.

2

Size chart

Detailed measurements of at least one base size (length, bust, waist, hem, sleeve length).

3

Fabric & GSM

Composition percentage + GSM, e.g. 55% linen 45% cotton / 160 GSM.

4

Color & print

Pantone number or physical swatch; vector or hi-res raster for prints.

5

Spec sheet

Seam type (French seam/overlock), topstitch width, special stitching (e.g. smocking).

6

Trim list

Zipper, button, drawstring, care label specs and placement.

7

Lining & interlining

Whether lining is needed, what interlining—directly affects the quote.

8

Finishing & packing

Hung or folded, how many per carton.

9

Reference sample or link

Greatly reduces the "which one did you mean" communication cost.

You Can Skip the Tech Pack, but Pack These 3 Things

You don't have to submit a full tech pack to start. If you only have a sketch, add these three and the factory can still quote you a reliable number:

1

A fabric swatch or clear name

Not "comfortable cotton," but "140 GSM combed cotton jersey."

2

One base-size measurement

Even just M, the factory can grade the rest.

3

A reference photo

The neckline, length, silhouette you want—one image beats three hundred words.

Off-shoulder shirred long dress showing stitch detail

Special construction like shirring or off-shoulder is ten times more accurate written in the spec sheet than spoken.

Fabric and GSM: Don't Let the Factory Decide for You

This is where beginners most easily get "decided for them." The factory defaults to the cheapest, easiest-to-sew, shortest-lead fabric in stock for sampling—not necessarily the drape and hand you want. GSM is the lifeblood of a dress, and different dress types sit in different ranges:

Dress typeSuggested GSMEffect
Resort / vacation dress120–160Breathable, floaty
Plus-size gown180–220Holds the silhouette
Just write "linen-cotton"possibly 110 thin fabricDistorts on the body (anti-example)

Our workable range is 80–220 GSM (light 80–120, mid 120–220); we're comfortable with natural/eco fibers (linen, organic cotton, ramie, Tencel) and technical fabrics alike (satin, acetate lining, sequin mesh). State your target GSM so we don't default to the thin end.

So the tech pack must state composition + GSM. If you only write "linen-cotton," the factory may give you 110 GSM thin fabric, and the finished product distorts the moment it's worn.

Size Split Is Free, but the Tech Pack Must State the Grading Rule

We support free size split: a 50-piece order can run from XS to plus, without being forced into one size. But "free" doesn't mean "don't write it"—the tech pack must state whether grading follows a height/weight table or scales proportionally from a base size.

If not stated clearly, reorders bring the classic misfire: "batch two doesn't match batch one." Write the grading rule into the spec sheet so reorders lock the pattern.

How a Low MOQ Dress Factory Controls Cost with a Tech Pack

Small orders fear hidden add-ons most: color change adds, size change adds, special construction adds. The tech pack lays all these on the table upfront, so the factory quotes a broken-down price once—each item below, clear at a glance:

Quote itemWhat it covers
Fabric & trimsFabric, lining, interlining, print/dye
SewingCutting, sewing, special construction
FinishingPressing, QC, pre-pack handling
PackingHanging/folding, pieces per carton

On our side, we return a broken-down quote within 24 hours after receiving a complete BOM (bill of materials). The more complete the tech pack, the more accurate the BOM, the less the quote "grows" unexpected fees mid-way. For a 50-piece small brand, this matters far more than a vague "total price."

A Real Misfire: No Strap Spec on the Sketch, a Different Dress Returned

The following is an anonymous peer case from within the trade—a common buyer mistake, used as a cautionary tale:

An independent designer sent a slip dress sketch, drawing only the silhouette and leaving the straps unspecified. The factory, by its own habit, made thin fixed straps sewn in place; but what she wanted was adjustable straps you could tie. The sample came back with the right length and shape, yet the feel on the body was off—not "wrong," just not the thing she had in mind. Fixing that one detail meant another round of sampling and shipping.

The lesson in one line: the details you think "go without saying" in a sketch are exactly the details the factory is most likely to decide for you.

Self-Check This List Before Sending the Tech Pack

Run through this checklist before you send—it blocks about 80% of sample misfires:

☐Do you have at least one base-size size chart?
☐Does the fabric say "composition + GSM" or just an adjective?
☐Are special constructions (smocking / shirring / topstitch) written into the spec sheet?
☐Did you give a color number or physical swatch for color and print?
☐Is the trim (zipper/button/care label) fully listed?
☐Is the grading rule stated?
Custom rose floral mini dress

One image + one size chart often makes the quote match your dress better than three hundred words.

Tech Pack FAQ

I have no tech pack at all, only inspiration images. Can we start?

Yes. Send inspiration images + a fabric swatch + one base-size measurement; we'll use them to make the first sample, then complete the spec sheet together. A tech pack is "the more complete the better," not "no move without it."

Does a tech pack need professional software? Is Excel OK?

Absolutely. The template we give clients is a structured table—front/back line art + the 9 fields above—usable in Excel or PDF.

If I submit the tech pack, will mid-way design changes cost extra?

Changes before PP sample confirmation are normally absorbed; major changes after PP confirmation are re-quoted by added process. So nailing the tech pack earlier saves more later.

Do you have certificates like OEKO-TEX?

We hold no third-party certification. We self-test shrinkage and color difference per batch against method standards, and provide swatch test records to partner clients for verification; when a third-party certificate is needed, we recommend requesting the certificate number from the fabric mill and checking it yourself.

50piece MOQ per style
~7days first sample
24hquote after complete BOM
9tech-pack core fields
FreeXS–plus size split
2018atelier & OEM since
8–12kpcs / month capacity
20+days bulk lead time

Want to turn a sketch into a quotable dress tech pack?

Send inspiration images + fabric intent + one base-size measurement; we'll return a broken-down quote within 24 hours.

Get a Dress OEM Quote

Are you looking for a reliable manufacturer of down home textile products?

We can quickly provide customers with market analysis, technical support and customized services.