Small-Batch Artisan Atelier for Independent Labels · Low MOQ 50 Pcs · Worldwide Shipping

Home / All / Sampling, Quality Control & Delivery / How long does production take?

How long does production take?

Update Time:2026/11/14
Direct Answer
Bulk lead time starts at 20 working days — typically 20–25 days for 50 pieces, 30–35 for 200, 40–50 for 500 (after the PP sample and fabric are in place), quoted in writing with your order.

You get the production schedule inside the 24-hour quote, not a sales-call estimate — so as your dress manufacturer both sides commit to the same dates for your linen dress or embroidered dress run, with no silent slips that blow your launch.

Quantity

Larger runs of a resort dress or plus-size dress are scheduled for realistic cutting and sewing capacity, so your delivery date is achievable rather than optimistic — we quote the date we can hit.

Craft content

Embroidery, smocking and custom printing each add stages that are planned into the schedule up front by an OEM dress manufacturer, not discovered mid-run, so nothing delays you quietly.

Confirmed in writing

The schedule arrives with your quote rather than being estimated on a call, so both parties commit to the same dates for your custom dress order — sampling ~7 days; bulk 20–25 days at 50 pcs, scaling to 40–50 days at 500 pcs.

Reorder speed

Approved styles are re-run faster — a small-batch dress factory keeps your pattern and spec on file for quick restocks of a floral print dress, so best-sellers never go stale.

Typical timeline

  1. Sampling: pattern, sample and fit approval quoted per style (~7 days).
  2. Bulk production: cutting, sewing and craft, scheduled by quantity — 20–25 days at 50 pcs, up to 40–50 days at 500 pcs.
  3. QC and packing: AQL 2.5 inspection, labelling and cartoning before shipping.

Timeline we commit to

  • Sampling: pattern, sample and fit approval quoted per style by a China dress manufacturer (~7 days).
  • Bulk production: cutting, sewing and craft scheduled by quantity of your smocked dress — 20–25 days at 50 pcs; up to 40–50 days at 500 pcs.
  • QC and packing: AQL 2.5 inspection, labelling and cartoning before shipping your wholesale dress order.
  • Reorders prioritised — a low-MOQ dress factory restocks a proven linen dress without re-quoting the build.
Sampling is completed and approved before the bulk schedule starts — the timeline you are given is for confirmed, signed-off work, not a hope.

Get a written schedule

Are you looking for a reliable manufacturer of down home textile products?

We can quickly provide customers with market analysis, technical support and customized services.